DatasetsTransmission of electricity between Finland and Estonia
The values in the data have been erroneously instantaneous values. From February 21, 2024, the data are correct 15-minute averages.Average data can be found correctly on the European transparency platform: https://transparency.entsoe.eu/transmission-domain/physicalFlow/show Measured electrical transmission between Finland and Estonia HVDC tile lines (Estlink 1 and Estlink 2). Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland. The value is updated once every 15 minutes after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values. The average shown every quarter is the average of the past quarter, i.e. the value coming with a time stamp of 14:15 is the average from 14:00-14:15. The Data before 13.06.2023 is in hourly resolution.
Download dataset
You can perform searches on the data and save the results for further processing in the following formats: JSON, CSV, XLSX, XML
Download datasetsAPI
You can download datasets through our open RESTful API. The API enables service development based on the data.
Dataset
Unit | MWh/h |
Data period | 15 min |
Dataset ID | 55 |
Status | Active |
Valid from | 1.1.1900 |
Additional information
Contact persons | Pentti.Saynatjoki@fingrid.fi |
Organization | Fingrid |
License | |
Keywords | Estonia, EE, Measured electrical transmission |
Content groups | Cross-border transmission |