Skip to main content

DatasetsTransmission of electricity between Finland and Estonia

The values in the data have been erroneously instantaneous values. From February 21, 2024, the data are correct 15-minute averages.Average data can be found correctly on the European transparency platform: https://transparency.entsoe.eu/transmission-domain/physicalFlow/show Measured electrical transmission between Finland and Estonia HVDC tile lines (Estlink 1 and Estlink 2). Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland. The value is updated once every 15 minutes after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values. The average shown every quarter is the average of the past quarter, i.e. the value coming with a time stamp of 14:15 is the average from 14:00-14:15. The Data before 13.06.2023 is in hourly resolution.

Download dataset

You can perform searches on the data and save the results for further processing in the following formats: JSON, CSV, XLSX, XML

Download datasets

API

You can download datasets through our open RESTful API. The API enables service development based on the data.

Dataset

Unit

MWh/h

Data period

15 min

Dataset ID

55

Status

Active

Valid from

1.1.1900

Additional information

Contact persons

Pentti.Saynatjoki@fingrid.fi

Organization

Fingrid

License

Keywords

Estonia, EE, Measured electrical transmission

Content groups

Cross-border transmission

Example data

Format